[1] Dawdy, D.R. and lethenmaier, D.P (1987), “Initiative for risk- based flood design.” journal
of hydraulic engineering, vol.8, 1041- 1051.
[2] Rasheed, Maha A.h. (1999), “Transient simulation and hypothetical model for al- adhaim
dam – break,” in PhD thesis submitted to the department of building and construction
engineering in the University of Technology.
[3] Kreuzer, H. and Bury k. (1984), “A probability based evaluation of the safety and risk
existing dams.” proceedings of the international conference of safety of Dams, Coibre. 23-
National research council, Committee on techniques for estimating probabilities of extreme
floods. (1988). “estimating probabilities of extreme floods”, methods and recommended
research, national academy press, Washington.
[4] Grishin, M. M., (1982), “Hydraulic structures.” Mir publishers, Moscow.
[5] National research council, Committee on techniques for estimating probabilities of extreme
floods. (1988), “estimating probabilities of extreme floods.” methods and recommended
research, national academy press, Washington.
[6] Piner, G.F., and Breclehoeft, J.D. (1968), “Application of the digital computer for aquifer
evaluation.” water resoursec research, vol. 4, No.5, pp. 1069 – 1093.
[7] Suresh, P. B. and Harr, M.E. (1962), “Transient development of the surface in a
homogeneous earth dam.” Geo technique, vol. 12, pp. 283 – 302.
[8] State committee for irrigation projects (1999) Civil work, “Civil work.” 1st, 2nd and third
part.
[9] Y. Z. J. S. D. S. Meng Yang, Xin Qian, “Assessing alternatives for sustainable management
of a flood control dam.” International Conference on Ecological Informatics and Ecosystem
Conservation (ISEIS 2010).
[10] Bacon, J.H. (1997), “Engineering of hazard reduction: A regulator’s perspective.” Michael
Leonard Lecture. HSE, London.
[11] ANCOLD (1983), “Australian national committee on large dams.” Guidelines for Dam
instrumentation and monitoring systems.
[12] Eun-Ho Oh, Kyoon-Tai Kim, Kyong-Hoon Kim, Jin-Man Kim, Jin-Woo Cho ,
“Development strategy of infrastructure risk assessment based disaster response and
management system.” World Journal of Engineering and Technology Vol.2 No.3B, September
18, 2014.
[13] Jones, J. C. (1999), “An independent consultant’s view on risk assessment and evaluation
of hydropower projects.” in Risk Analysis in Dam Safety Assessment, by Kuo, J.T. and Yen,
B.C. (eds.), Water Resources Publications, LLC. ISBN 1-887201-20-3.