Document Type : Original Article
[1] Dawdy, D.R. and lethenmaier, D.P (1987), “Initiative for risk- based flood design.” journal
of hydraulic engineering, vol.8, 1041- 1051.
[2] Rasheed, Maha A.h. (1999), “Transient simulation and hypothetical model for al- adhaim
dam – break,” in PhD thesis submitted to the department of building and construction
engineering in the University of Technology.
[3] Kreuzer, H. and Bury k. (1984), “A probability based evaluation of the safety and risk
existing dams.” proceedings of the international conference of safety of Dams, Coibre. 23-
National research council, Committee on techniques for estimating probabilities of extreme
floods. (1988). “estimating probabilities of extreme floods”, methods and recommended
research, national academy press, Washington.
of hydraulic engineering, vol.8, 1041- 1051.
[2] Rasheed, Maha A.h. (1999), “Transient simulation and hypothetical model for al- adhaim
dam – break,” in PhD thesis submitted to the department of building and construction
engineering in the University of Technology.
[3] Kreuzer, H. and Bury k. (1984), “A probability based evaluation of the safety and risk
existing dams.” proceedings of the international conference of safety of Dams, Coibre. 23-
National research council, Committee on techniques for estimating probabilities of extreme
floods. (1988). “estimating probabilities of extreme floods”, methods and recommended
research, national academy press, Washington.
[4] Grishin, M. M., (1982), “Hydraulic structures.” Mir publishers, Moscow.
[5] National research council, Committee on techniques for estimating probabilities of extreme
floods. (1988), “estimating probabilities of extreme floods.” methods and recommended
research, national academy press, Washington.
[6] Piner, G.F., and Breclehoeft, J.D. (1968), “Application of the digital computer for aquifer
evaluation.” water resoursec research, vol. 4, No.5, pp. 1069 – 1093.
[7] Suresh, P. B. and Harr, M.E. (1962), “Transient development of the surface in a
homogeneous earth dam.” Geo technique, vol. 12, pp. 283 – 302.
[8] State committee for irrigation projects (1999) Civil work, “Civil work.” 1st, 2nd and third
part.
[9] Y. Z. J. S. D. S. Meng Yang, Xin Qian, “Assessing alternatives for sustainable management
of a flood control dam.” International Conference on Ecological Informatics and Ecosystem
Conservation (ISEIS 2010).
[10] Bacon, J.H. (1997), “Engineering of hazard reduction: A regulator’s perspective.” Michael
Leonard Lecture. HSE, London.
[11] ANCOLD (1983), “Australian national committee on large dams.” Guidelines for Dam
instrumentation and monitoring systems.
[12] Eun-Ho Oh, Kyoon-Tai Kim, Kyong-Hoon Kim, Jin-Man Kim, Jin-Woo Cho ,
“Development strategy of infrastructure risk assessment based disaster response and
management system.” World Journal of Engineering and Technology Vol.2 No.3B, September
18, 2014.
[13] Jones, J. C. (1999), “An independent consultant’s view on risk assessment and evaluation
of hydropower projects.” in Risk Analysis in Dam Safety Assessment, by Kuo, J.T. and Yen,
B.C. (eds.), Water Resources Publications, LLC. ISBN 1-887201-20-3.
[5] National research council, Committee on techniques for estimating probabilities of extreme
floods. (1988), “estimating probabilities of extreme floods.” methods and recommended
research, national academy press, Washington.
[6] Piner, G.F., and Breclehoeft, J.D. (1968), “Application of the digital computer for aquifer
evaluation.” water resoursec research, vol. 4, No.5, pp. 1069 – 1093.
[7] Suresh, P. B. and Harr, M.E. (1962), “Transient development of the surface in a
homogeneous earth dam.” Geo technique, vol. 12, pp. 283 – 302.
[8] State committee for irrigation projects (1999) Civil work, “Civil work.” 1st, 2nd and third
part.
[9] Y. Z. J. S. D. S. Meng Yang, Xin Qian, “Assessing alternatives for sustainable management
of a flood control dam.” International Conference on Ecological Informatics and Ecosystem
Conservation (ISEIS 2010).
[10] Bacon, J.H. (1997), “Engineering of hazard reduction: A regulator’s perspective.” Michael
Leonard Lecture. HSE, London.
[11] ANCOLD (1983), “Australian national committee on large dams.” Guidelines for Dam
instrumentation and monitoring systems.
[12] Eun-Ho Oh, Kyoon-Tai Kim, Kyong-Hoon Kim, Jin-Man Kim, Jin-Woo Cho ,
“Development strategy of infrastructure risk assessment based disaster response and
management system.” World Journal of Engineering and Technology Vol.2 No.3B, September
18, 2014.
[13] Jones, J. C. (1999), “An independent consultant’s view on risk assessment and evaluation
of hydropower projects.” in Risk Analysis in Dam Safety Assessment, by Kuo, J.T. and Yen,
B.C. (eds.), Water Resources Publications, LLC. ISBN 1-887201-20-3.